OP220 Worm Assembly Synthesis n1. Purpose: Bearing assembly pressed into housing; Worm mounted O-ring; Worm press-fit coupling; Worm lock screw; n2. Compatible products: D571200; n3. Equipment operation process n1)Take the worm gear, pass visual inspection, scan the code with code reader (manual 3s) n2)Take O-ring and install it into the worm, put the whole into the lower fixture, the sensor senses in position (manual 3s) n3)Shoot the start switch (manual 1s) n4)Move the door down to safe height, servo press drive the bearing press head down. (6s) n5)Press-in is completed, the press head returns automatically (2s) n6)Horizontal shift load mechanism pushes the coupling press head above the press (2s) n7)Servo press drives the coupling press head down (6s) n8)Press-in passes, the press head returns automatically (2s) n9)Fixture shifting system moves the lower fixture under the tightening gun (2s) n10)Electric gun shift load mechanism will drive the electric torque gun down (2s) n11)Electric gun will tighten the locking screw at 15-20NM (5s) n12)Electric gun shift load mechanism retracts (2s) n13)The fixture lifting system moves the lower fixture under the screwing press (2s) n At the same time the moving door opens n14)Manually take down the workpiece, transfer to the next process (failure alarm, manually take out the unqualified workpiece, put it into the NG box, trigger the NG photoelectricity, and reset the system) (manual 2s)
Specification: OP220 Worm Assembly Synthesis Inventor 3D Model
|
User Reviews
Be the first to review “OP220 Worm Assembly Synthesis Inventor 3D Model”
You must be logged in to post a review.
![OP220 Worm Assembly Synthesis Inventor 3D Model](https://3dmec.net/wp-content/uploads/thumbs_dir/240000335-101-1-qpqjft4c9k1t10x60st2tsv4p6n8nc4xstqvydoni4.png)
There are no reviews yet.